Oxy Minimum Facilities Platform

Provision of Minimum Facility Platforms (MFP’s) IDD EL Shargi Field PS-1- Doha offshore

Project Description

Client:  Occidental Petroleum of Qatar Ltd.
Location: Offshore Filed, Qatar
Year Completed: March-2015
Value: QAR 39 Million

Role & Scope of Work: Prime Contractor;
Scope of work includes Onshore fabrication, load-out and sea-fastening of 7 nos. Minimum Facility Platforms (MFPs) including but not limited to engineering (fabrication, temporary works, etc.), fabrication of topsides and templates, weighing of topsides, pre-commissioning, load-out, Lifting by Floating Installation Barge and sea-fastening of the MFPs.

Oxy Minimum Facilities Platform
Civil Building and MEP Works

Civil Building and MEP Works

Project Description

Client:  Mannai Corporation.
Location: Salwa, Qatar
Year Completed: November-2017
Value: QAR 33 Million

Role & Scope of Work: Prime EPC Contractor
Engineering, Procurement and Construction of Qatar Logistic Buildings at Industrial Area – work includes Three (3) Main Stores, Four (4) Guard Housed, Substation & External Work including all MEP & HVAC Services with total built up area 12,000 m²

Civil Building and MEP Works
Civil Building and MEP Works

EPC of New Head Quarter and Facilities

Project Description

Client:  Qatar Engineering & Construction Co.
Location: Ras Laffan, Qatar
Year Completed:  November-2017
Value: QAR 100 Million

Role & Scope of Work: Prime EPC Contractor
Detailed Engineering, Procurement, Construction, Testing, Pre-commissioning, Commissioning for New Head Quarter & Facilities at Ras Laffan.
Scope includes Construction of Main Offices Building, Fabrication Workshop, P&M Workshop, Paint Offices & Stores, Substation, Mosque & External Work including all MEP & HVAC Services with total built up area 21,000 m².

EPC of Waste Water Treatment Plant

EPC of Waste Water Treatment Plant

Project Description

Client:  Qatargas Operating Company.
Location: Ras Laffan, Qatar
Year Completed:  December-2014
Value: QAR 100 Million

Role & Scope of Work: Prime EPC Contractor
Engineering the work of the whole of the facilities, including any required Basic Engineering, Process Engineering, Design Development Engineering, Detailed Engineering, Procurement Engineering, Construction Engineering and Commissioning Engineering, Purchasing ,Supplying and delivering to the site all materials , equipment including Commissioning Spare parts. Inspecting, Expediting, Coordinating, Forwarding and customs clearing for all materials and equipment. Construction, Pre Commissioning, Commissioning and start up facilities.

EPC of Waste Water Treatment Plant
QAPCO New Furnaces and Ethylene Tank Project

QAPCO New Furnaces and Ethylene Tank Project

Project Description

Client:  Qatar Petrochemical Company.
Location: Mesaieed, Qatar.
Year Completed:  Arp-2014
Value: QAR 121 Million

Role & Scope of Work: Subcontractor
Structural fabrication and erection works, equipment erection, piping fabrication and installation, electrical, instrumentation works, painting and insulation works and pre commissioning works. Assembly of Furnace modules and erection, Furnace piping and Shutdowns for Tie in works. Construction of Ethylene Tank works and associated equipment and facilities. The work also includes Tank fabrication, and erection, Piping works associated with structural, and Electrical and Instrumentation works.

QAPCO New Furnaces and Ethylene Tank Project
Laffan Refinery DHT Project

Laffan Refinery DHT Project

Project Description

Client:  Qatargas Operating Company Limited.
Location:  Ras Laffan, Qatar.
Year Completed:  Arp-2014
Value: QAR 42 Million

Role & Scope of Work: Construction Subcontractor;
Laffan Refinery DHT Project – Mechanical, Piping, Structure, Insulation, Painting, E&I Construction works.

Laffan Refinery DHT Project
Various Plant Turnaround Shutdown Field Maintenance Works

Various Plant Turnaround, Shutdown & Field Maintenance Works

Project Description

Client:   RasGas, Oryx GTL, Shell GTL, ADGAS
Location:  Ras Laffan & Mesaieed, Qatar | Abu Dhabi, UAE
Year Completed:  Ongoing
Value: Unit Rates/ Lump sum Contracts
Engineering Consultant:  N/A

Role & Scope of Work:  Prime Contractor;
Complete Train Shutdown including supply of support manpower to Client, work scope also includes work pack Review, Schedule preparation in P6, monitory, Reporting and Technical manpower services associated with the following major long term contacts:

  • Six (6) Years Turnaround Main Mechanical Services Contracts for Shell GTL
  • Five (5) Years Shutdown Maintenance Contract for RasGas
  • Five (5) Years Shutdown Maintenance Contract for Oryx GTL
  • Long Term Maintenance/Shutdown contract with ADGAS (UAE)
  • Five (5) Years Field Maintenance Technical Manpower and Equipment supply for RasGas
  • Five (5) Years Call off Contract for Hire of Equipment for at QP Refinery, Mesaieed

The Challenges

Resources mobilization within short notice and achieving completion within scheduled plant restart date.

Various Plant Turnaround Shutdown Field Maintenance Works
Construction Works for Jetty Boil off Gas Recovery Project

Construction Works for Jetty Boil off Gas Recovery Project

Project Description

Client:  Qatargas Operating Company Limited.
Location:  Ras Laffan, Qatar
Year Completed:  Sep-2013
Value: QAR 299 Million
Engineering Consultant:   N/A

 

Role & Scope of Work:  Prime Construction Contractor
Jetty Boil-off Gas Recovery (JBOG) Project is an environmental development project implemented to minimize flaring from the six liquefied natural gas (LNG) berths at Ras Laffan Port. Construction Scope of work includes Earth and Civil works, Structural fabrication and erection, Equipment installations, Piping fabrication, Painting, installation, and insulation, testing and cleaning works at Central Compression Area (CCA) & Off Plot areas.

The Challenges

Construction works during peak summer

PIPE RACK AREA CCA

Package 12 Accommodation Platforms/ Jackets

Project Description

Client:  Maersk Oil Qatar
Location:  Mesaieed & Offshore Qatar
Year Completed:  Jan-2008
Value: QAR 91 Million
Engineering Consultant:  SLP Engineering

Role & Scope of Work:  Subcontractor
Onshore Fabrication works for Block 5 Field Development Project – Package 12 Accommodation Platforms BF, GC, CF & EF Fabrication of Jackets, Pile & Bridges and assistance for offshore pre-commissioning and commissioning works

The Challenges

Load out

Maersk Oil Qatar
Kharamaa Substations

Kharamaa Substations – Erection, Testing & Commissioning Works

Project Description

Client:  KAHRAMAA (Various Main Contractor viz. i..e. Siemens/ABB/ Areva/ Isolux)
Location:  Doha, Qatar
Year Completed:  Sep-2012
Value: QAR 273 Million
Engineering Consultant:  Qatar Engineering Associates

Engineering Consultant:  Subcontractor
Engineering, Civil works, Building Services, Fire, Safety, HVAC, Mechanical, Electrical Erection, Testing & Commissioning Works for KHARAMAA Qatar Power Transmission System Expansion Phase 5, 6, 7, 8 & Phase 8 – Various Substations Packages throughout Qatar

The Challenges

Location of construction site spread across Qatar and logistics arrangements

Kharamaa Substations