Project Description
Client: Al Jazeera Network
Location: Doha, Qatar
Year Completed: January 2021
Role & Scope of Work:
Prime EPIC Contractor.
The scope of works includes Design & Build for Digital Division Building for Al Jazeera Media Network and Substation with total built up area of 2,100M2
![WhatsApp Image 2022-10-03 at 12.46.42 (2)](https://qcon.com.qa/wp-content/uploads/2022/10/WhatsApp-Image-2022-10-03-at-12.46.42-2-768x1024.jpeg)
![WhatsApp Image 2022-10-03 at 12.46.41 (1)](https://qcon.com.qa/wp-content/uploads/2022/10/WhatsApp-Image-2022-10-03-at-12.46.41-1-1024x768.jpeg)
![WhatsApp Image 2022-10-03 at 12.46.41](https://qcon.com.qa/wp-content/uploads/2022/10/WhatsApp-Image-2022-10-03-at-12.46.41-1024x768.jpeg)