Project Description
Client: Qatar Energy /Saipem
Location: Offshore, Qatar
Year Completed: October 2022
Role & Scope of Work:
Prime Subcontractor Contractor
The scope of works includes fabrication and load out of Topside of WHP-U08C (Topside and topsides facilities of WHP-U08C), Subsea structures, Prefabrication of subsea pipelines/ umbilical and risers, Brownfield Items, Brownfield structural deck extensions/modifications and retrofit risers/ J-tube at PS1K at existing PS-1 – WHP-U08C TOPSIDES (GF) => 1,073 Ton, JACKET PS1K Hook Up => 115 Ton, PS1K Deck Extension (BF) => 181 Ton, DECK Hook Up => 222 Ton, Subsea => 253 Ton