EPC for WHP12N – Jacket Execution for NFPS, Project

Project Description

Client: Qatargas/Saipem
Location: Offshore, Qatar
Year Completed: August 2021

Role & Scope of Work:

Prime Subcontractor Contractor.

The scope of works includes fabrication of Jacket WHP12N (four legged structure) consisting of 2 (two) boat landings, 1 (one) riser guard, 2 (two) J-tubes (C.S), Riser clamps, 1 (one) Temporary Work Deck [TWD], Temporary NAV-AIDs, signage etc , Foundation Piles (4x): Pile diameter 66”, penetration length is approximately 128 meters, Jacket – 1,943 MT, Piles – 1,985 MT

EPC for the Brownfield Tie-ins of RL Looping, RLSS and RGESS

Project Description

Client: Qatargas (South)
Location: Offshore, Qatar
Year Completed: February 2022

Role & Scope of Work:

Prime EPIC Contractor.

The Scope of works includes but is not limited to Design Development, verification of AFC Deliverables, management of purchase orders, procurement of piping bulks and E&I bulks, Transportation, Installation, Pre-Commissioning, Commissioning and Handover in relation to the equipment modifications, system modifications, ancillary modifications and instrumentation replacements, including mobilization of Marine Barge/ Vessels for offshore brownfield work  execution- 6A-I2P1 RL Looping, 6B-Dry Gas System Spare Slot Project (RLSS), 6C- Wet Gas System Spare Slot Project (RGESS)

WHP-U08C Topside, Pipelines, Umbilical & Brownfield Modification at PS1K (PHASE 5-1B)

Project Description

Client: Qatar Energy /Saipem
Location: Offshore, Qatar
Year Completed: October 2022

Role & Scope of Work:

Prime Subcontractor Contractor

The scope of works includes fabrication and load out of Topside of WHP-U08C (Topside and topsides facilities of WHP-U08C), Subsea structures, Prefabrication of subsea pipelines/ umbilical and risers, Brownfield Items, Brownfield structural deck extensions/modifications and retrofit risers/ J-tube at PS1K at existing PS-1 – WHP-U08C TOPSIDES (GF) => 1,073 Ton, JACKET PS1K Hook Up => 115 Ton, PS1K Deck Extension (BF) => 181 Ton, DECK Hook Up => 222 Ton, Subsea => 253 Ton

NFPS Offshore Project (EPCO)/ NFPS Pipeline Project (EPCL)

Project Description

Client: Qatargas (South)
Location: Offshore, Qatar
Year Completed: Ongoing

Role & Scope of Work:

Prime Subcontractor Contractor.

The Scope of works includes but not limited Fabrication and load out of Brownfield Items, Subsea Structures & Subsea Riser-Spool assemblies

EPC for Near Zero Liquid Discharge (NZLD) Project at RLOC

Project Description

Client: Ras Laffan Olefins Company (RLOC)
Location: Ras Laffan, Qatar
Year Completed: Ongoin

Role & Scope of Work:

Prime EPC Contractor

Design and Detailed Engineering including Engineering of the Process Integrator, Procurement, Construction, Pre-commissioning, Commissioning, Performance Test & Startup and Reliability run for Near Zero Liquid Discharge Project

EPIC for Integrated Gas Supply to Mesaieed Consumers (IGSMC)

Project Description

Client: Qatar Energy
Location: Mesaieed, Qatar
Year Completed: Ongoing

Role & Scope of Work:

Prime EPIC Contractor.

The scope of works includes Detailed Design and Engineering, Procurement, Installation, Construction, Pre-commissioning, Commissioning, Performance testing, and start-up (EPIC) including all Civil, Mechanical, Electrical and Instrumentation works associated with:

  1. Pipeline (various sizes ranging from 36” to 3” of LP Gas Pipeline, Tail Gas pipeline, Nitrogen line, Flare pipeline) works including micro tunneling, pipeline pigging & baseline survey, etc.
  2. Pipeline Decommissioning (existing 16” buried Qatar Steel pipeline & 16” buried QAPCO pipeline) after successful commissioning of the IGSMC project
  3. Four (4) nos. metering stations – MS1, MS2, MS3 and MS4. Each of metering station typically includes custody metering facility, gas chromatograph, ESDVs, MOVs, LER buildings, electrical rooms and battery rooms.
  4. Modification works at New Station S1
  5. Relocation of HIPPS for LP stream from Station SR2 Pig Launcher for LP Header.
  6. Modification Work at Station S
  7. Segregation of Qatalum Gas Supply
  8. Automatic Clean Agent Suppression System for LER Buildings at Metering Stations (MS-1, MS-2, MS-3, MS-4)